• No Ash Accumulation Continuous Annealing Furnace for Steel Wire
  • No Ash Accumulation Continuous Annealing Furnace for Steel Wire
  • No Ash Accumulation Continuous Annealing Furnace for Steel Wire
  • No Ash Accumulation Continuous Annealing Furnace for Steel Wire
  • No Ash Accumulation Continuous Annealing Furnace for Steel Wire
  • No Ash Accumulation Continuous Annealing Furnace for Steel Wire

No Ash Accumulation Continuous Annealing Furnace for Steel Wire

After-sales Service: Warranty Period of 1 Year
Warranty: Warranty Period of 1 Year
Type: Gas Heating
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
No Ash Accumulation Continuous Annealing Furnace for Steel Wire pictures & photos
No Ash Accumulation Continuous Annealing Furnace for Steel Wire
US $200,000-1,200,000 / Set
Min. Order: 1 Set
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
RCL
Certification
ISO
Structure
Horizontal Type
Brand
Suntech
Transport Package
Pallets
Specification
36, 48 or 56 lines
Trademark
SUNTECH
Origin
China
HS Code
8486201000
Production Capacity
30 Sets/3months

Product Description

1. Main parameters of steel wire online heat treatment equipment

 

No Item Specification
1 Material Steel wire
2 Wire diameter range φ0.35~φ4.5 mm
3 Wire lines 24 or 48 lines
4 Speed(DV) DV=75 or 95m*mm/min(max speed 70 or 90m/min)
5 Fuel type NG/LPG


2.Technological process of production

Pay off→Degreasing→Furnace→Water quench→Water cooling→Pickling→Water rinsing→Boraxing→Drying→Take up

 

3. Main process introduction

Degreasing: remove the uneven soap powder and borax, and paint a layer of soap powder and borax on the surface of bright steel wire, so that the surface coating of steel wire is more uniform.

Furnace and quench: make the deformation hardening steel wire to restore the ductility, and obtain the ideal microstructure to meet the cost of steel wire in tensile strength, shape, elongation and other requirements.

Pickling: remove all oxides and residues on the surface of the steel wire.

Boraxing: as the carrier of lubricating powder, convenient for subsequent drawing.

No Ash Accumulation Continuous Annealing Furnace for Steel WireNo Ash Accumulation Continuous Annealing Furnace for Steel WireNo Ash Accumulation Continuous Annealing Furnace for Steel Wire
4. Furance control plan

 

Furnace Item Requirement
Wire position No crossing or overlap
Branching comb No deformation or damage
Temperature Last zone: ± 3 ºC
other zones: ± 10 ºC
Furnace pressure ≥ 400mm water column
Last zone pressure ≤ 150mm water column, allowed for fluctuations
Furnace bottom condition No ash accumulation
Combustion nozzle condition Open combustion nozzle combustion

 

5. Packaging & Shipping

We can pack it by pallet, or according to the customers' specific requirements.

Port: Shanghai/Ningbo

 

6. Our Services

In order to guarantee the customers are able fully to operate the machine, if the customer need, we can help customer training, includes:
(1) Correct operating mode
(2) Correct maintenance way
(3) Correct technological process control
(4) Remove simple problem
All the machine of our company have already been widely used in steel wire area.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now