Customization: | Available |
---|---|
After-sales Service: | Warranty Period of 1 Year |
Voltage: | 380V |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Technological process of production
Blank inspection → racking → chemical degreasing → water washing → electrolytic degreasing → water washing → Anodizing (in chromium plating bath) → chromium electroplating → recycling → water washing → put down → water washing → drying → inspection → hydrogen removal → packaging
2. Main process introduction
Chemical degreasing:remove the oil on the surface of products
Electrolytic degreasing: further remove the oil on the surface of products to ensure the binding force of the coating .
Pickling: remove the oxide from the surface of products and activate the product surface .
Water rinsing: clean the product thoroughly after the tank to avoid mutual contamination of the tank.
Anodizing:Let the surface of the steel substrate be in an activated state and produce micro rough surfaces, and then proceed with plating. Ensure obtaining a hard chromium coating with good adhesion.
Chrome plating: the product is coated with a uniform coating.
Hydrogen removal:reduce the brittleness of chromium plating and clean the hydrogen embrittlement of the base metal.
3.Photos
4. Solution preparation
Anodizing: DK 30~50 A/dm2
Chrome plating solution: Cr2O3 200~250 g/L
H2SO4 2.0~3.2 g/L
Cr3+ 25-35 g/L
Additives 16-20 ml/L
Temperature 55~65 ºC
DK 30~50 A/dm2
Hydrogen removal: Temperature 200~230 ºC
Time 2~4hours
5.Common faults and solutions
Common faults | Cause of occurrence | Solution |
Insufficient thickness | Insufficient power supply | Increase power consumption |
Low current efficiency | Adjusting plating solution and process parameters | |
The coating is corrugated and cracked | There is stress on the surface of the part | Improving the surface machining quality before plating |
Heat treatment to eliminate surface stress | ||
Surface burrs | High current density | Reduce current density |
Surface peeling and pitting | Inadequate pre-treatment | Strengthen pre-treatment |
6.Packaging & Shipping
We can pack it by pallet, or according to the customers' specific requirements.
Port: Shanghai/Ningbo
7. Our Services
In order to guarantee the customers are able fully to operate the machine, if the customer need, we can help customer training, includes:
(1) Correct operating mode
(2) Correct maintenance way
(3) Correct technological process control
(4) Remove simple problem
All the electroplating machine of our company have already been widely used in electroplating area.
Any doubt please contact us.